Prime power generator and switchgear integration engineering.

Running an islanded microgrid on natural gas reciprocating engines or turbines is fundamentally different from sizing a standby diesel backup generator. High-density GPU and batch compute racks present fast step-load swings and non-linear harmonic currents against a low-inertia bus, while summer afternoon temperatures above 102°F and 3,000-foot Permian elevations derate engine nameplates.

Electrical and generation engineers who produce stamped one-line diagrams, model governor and automatic voltage regulator (AVR) response to compute step loads, coordinate medium-voltage protective relays, and specify grounding grids keep projects from tripping offline on day one. Tell Methane.Exchange your electrical engineering scope so we can introduce you when a qualified project needs generation integration.

Send your generation & electrical discipline

Other engineering disciplines: Wellhead gas conditioning & fuel spec · High-density compute cooling & pad layout · Sample qualification packet.

Drawing of generation, switchgear, compute and cooling interfaces. Not a real design.
Drawing of generation, switchgear, compute and cooling interfaces. Not a real design.

Send your generation and electrical discipline

Let us know the voltage classes, power system studies, and generator control architectures your engineering team designs or reviews. We read it and reply by email or phone with one or two questions. Nothing goes to anyone else without your permission.

Deliverables project parties frequently ask for:

  • Site-specific elevation, ambient temperature, and methane-number derate curves for reciprocating engines and gas turbines.
  • One-line diagrams, 480V / 4.16 kV / 13.8 kV / 34.5 kV switchgear specifications, and multi-unit isochronous load-sharing controls.
  • ETAP or SKM short-circuit, protective relay coordination, arc-flash, and IEEE 519 harmonic distortion studies.
  • IEEE 80 grounding grid design, lightning protection, and BESS or capacitor-bank transient buffering for GPU step loads.